logo di stampa inglese
 
 

Waste management plants

In an Italian context characterised by a considerable dearth of infrastructures in the waste management sector, the Hera Group constitutes an outstanding example with one of the nation’s most impressive plant structures comprising more than 70 plants capable of covering the full range of possible treatments of waste.

Of these plants, seven are waste-to-energy plants and guarantee Hera’s leadership role in Italy in recovering electricity from waste with a total treatment capacity of 600,000 tonnes p.a. and an installed capacity greater than 60 MW.

Plants

Treatment capacity (ton)

Installed capacity (MW)

WTE Forlì*

120.000

11

WTE Ravenna

56.500

6

WTE Rimini

127.600

10

WTE Modena

140.000

7

WTE Ferrara*

140.000

13

WTE FEA

180.000

22

WTE Ecologia-Ambiente

40.000

4

The Bologna WTE plant (22 MW installed capacity) went into operation in 2004, and has a CIP6 contract until 2011. The Ferrara(13 MW installed capacity) and Forlì WTE (11 MW installed capacity) plants are new generation, and have gone into operation over the past six months.

Another two new WTE plants in Modena(19 MW and 6 MW installed capacity) and Rimini( 11 MW installed capacity) will go into operation during the next 15 months.